![]() |
![]() |
![]() |
![]() |
|||
![]() |
|
![]() |
||||
|
The 2010 Road Program includes the following work: City wide patching, curb and sidewalk replacement
Resurfacing of Briggs & Estes Streets, Grind and Resurface, Resurfacing and Installation of Sanitary Sewer Along Woodland Road, Grind and Resurface, Reconstruction of Fourth Street from Main Street to Batavia Road, Includes installation of curbs on both sides of the street and sidewalk on one side of the street, Reconstruction of Jackson Street from Fourth Street to the Fire Station #1,
Includes installation of curbs on both sides of the street, and sidewalk on one side of the street, Batavia Road from Route 56 to Route 59,
Road widening at Rockwell intersection, curb replacement on the south side of Batavia Road from Route 59 to Country Ridge Drive, grinding and resurfacing from Route 59 to Rockwell Street, and finish patching work from Rockwell Street to Route 56. To learn about other road projects visit the websites of Illinois Department of Transportation, DuPage County Division of Transportation and the Illinois Tollway Authority.
|
||||||
|
|
||||||
|
|
|
|
|
|
|
|