- Home
- Our Community
- Construction/Development Projects
- Private Development Projects
- Elite Ambulance office/warehouse
Elite Ambulance Office/Warehouse
Project Description:
Proposed development of an approximately 2.5-acre site with a 23,250-square foot one-story building, 67 surface parking spaces, and associated parking lot lighting, landscaping, and stormwater management improvements. (Project 2020-0345)
Location:
3S140 Talbot Avenue
Proposed development of an approximately 2.5-acre site with a 23,250-square foot one-story building, 67 surface parking spaces, and associated parking lot lighting, landscaping, and stormwater management improvements. (Project 2020-0345)
Location:
3S140 Talbot Avenue
Northeast corner of Talbot Ave/Calumet Ave W
Applicant:
Jeff Graefen Development, Inc
Project Status:
A formal public hearing for the preliminary planned unit development (PUD) took place at the 5-6-21 and 7-8-21 Plan Commission/Zoning Board of Appeals meetings. (Legal Notice PDF). The Commission recommended City Council approval at its 7-8-21 meeting; the City Council approved the preliminary PUD request at its 7-19-21 meeting via Ordinance O2021-29.
Applicant:
Jeff Graefen Development, Inc
Project Status:
A formal public hearing for the preliminary planned unit development (PUD) took place at the 5-6-21 and 7-8-21 Plan Commission/Zoning Board of Appeals meetings. (Legal Notice PDF). The Commission recommended City Council approval at its 7-8-21 meeting; the City Council approved the preliminary PUD request at its 7-19-21 meeting via Ordinance O2021-29.
Documents:
- General Application (PDF), 3 pages, submitted by Jeff Graefen, dated 12-18-20
- Application Form D (PDF) , 5 pages, submitted by Jeff Graefen, dated 12-18-20
- Authorization Letter (PDF), 1 page, prepared by John Atkenson, dated 6-24-20
- Title Insurance (PDF), 18 pages
- Title Survey (PDF), 1 sheet, prepared by Chicago Title Insurance Company
- Parking Requirements (PDF), 1 page, prepared by KDC Consultants Inc., dated 8-14-20
- Photometrics Plan (PDF), 1 sheet, prepared by Econolight, dated 12-6-20
- Photometric Lighting Specs (PDF), 7 pages, prepared by Econolight and Cree Lighting
- Landscape Plan (PDF), 1 sheet, prepared by Beary Landscaping, dated 1-5-21
- Business Operations Letter (PDF), 1 page, prepared by John Atkenson, dated 8-14-20
- Building Elevation Plans (PDF), 6 sheets, prepared by M. J. Root Architect, dated 1-31-20
- Wetland Report (PDF), 16 pages, prepared by Christopher B. Burke Engineering, Ltd., dated 6-2-20
- Building Elevations, 1 sheet, prepared by M.J. Root Architects, dated 6-9-21
- Engineering Response No. 1, 1 page, prepared by KDC Consultants Inc., dated 6-10-21
- PE Estimates, 1 sheet, prepared by KDC Consultants Inc., dated 6-8-21
- Preliminary PUD Staff Review, Graefen Response, 2 pages, dated 6-18-2021
- Decorative CMU Blocks, 1 photo, undated
- Talbot Concept Plan, 1 sheet, prepared by KDC Consultants Inc., dated 6-10-21
- Engineering Response No. 2, 4 pages, prepared by KDC Consultants Inc., dated 6-25-21
- Stormwater Management Report Summary, 2 pages, prepared by KDC Consultants Inc., dated 6-24-21
- Stormwater Management Calculations, 10 pages, prepared by KDC Consultants Inc., dated 6-25-21
- Architect Letter, 1 sheet, prepared by M.J.Root Architects, dated 6-30-21
- Letter Clarifying Business Practice, 1 page, prepared by Elite Medical Transportation, dated 7-1-21
- Traffic Restrictions Letter, 1 page, submitted by Elite Ambulance, dated 7-14-21