September 3, 2019 Update

Geneva Construction will be paving a layer of asphalt on John Bardeen Drive, Arthur Compton Court, Albert Einstein Drive, Marie Curie Lane, Pierre Curie Lane, and Enrico Fermi Court on Thursday, September 5th. Please park in driveways and designated parking spaces, and not on the street during this time.

It is possible that the final asphalt surface course will be paved on these same streets on Friday, September 6th.

Electrical work and restoration will continue throughout the entire subdivision.

Project completion is expected to occur in mid to late September.



Resident Notices

Below are notices distributed to residents with information about the project:

2019-09-03
2019-08-15
2019-08-01
2019-07-26
2019-07-22
2019-07-19
2019-07-16
2019-07-11
2019-07-08
2019-07-05
2019-06-25



Planned Staging of Emerald Green Curb and Gutter Removal and Replacement
Curb and Gutter Staging


Geneva Construction created this exhibit to communicate their approach to curb and gutter removal and replacement. Their approach is to affect only one side of the road in an area at a time, as parking is limited. Vehicles on one side of the street will be able to access their driveways, before the other side loses access to their driveways.




Scope of Work

Emerald Green Subdivision
  • complete removal and replacement of curb and gutter
  • pavement and driveway patching
  • removal and replacement of existing street lights with LED retrofits
  • resurfacing of the roadway

Stafford Place, northeast of Warren Avenue
  • complete removal and replacement of curb and gutter
  • partial removal and replacement of deficient sidewalk
  • pavement patching
  • resurfacing of perpendicular parking areas adjacent to street